Cost and schedule contingency that stands up to the board, the audit and time.
Know how much to set aside before committing capital, and why. Archai Risk starts from your budget and your schedule and calculates a reserve the size of the risk: no extra idle capital and no surprise change order later. Every number shows where it came from and who approved it.
Method applied at S11D, US$ 4.5 bn of CAPEX delivered two months ahead of schedule · Created by the Academic Director of AACE Brasil · In production in 4 languages
- A reserve the size of the risk
- Fewer cost and schedule surprises
- A number that stands up to audit
- First result in 1 day
The contingency you can't defend costs more than the one you approved.
Inherited percentage
Contingency was set at "10% of historicals". At the gate, no one can say where the number comes from — or why it isn't 7% or 15%.
Disconnected matrix
The qualitative risk matrix lives in one spreadsheet; the budget, in another; the schedule, in a third system. Nothing talks to anything else, and the simulation — when there is one — is redone by hand at every revision.
Decisions without memory
The decision to proceed was made in a meeting. Two years later, in the claim or the arbitration, there is no record of assumptions, alternatives considered or who approved what.
Too much contingency is idle capital. Too little turns into change orders, claims and delay. Either way, the bill arrives after the gate.
What changes in your results.
Capital that doesn't sit idle
You find out whether the reserve is above or below what the project's risk calls for. If it is above, the excess stops sitting idle.
Fewer change orders and fewer claims
If the reserve is below the risk, you see it before signing the contract, when fixing it is still cheap.
A team that decides instead of building spreadsheets
With the information at hand, an experienced analyst runs the full cost and schedule analysis in 1 day. With every revision, the numbers are recalculated automatically.
An answer ready for whoever asks
The board, auditors and lenders ask where the number came from. The answer takes minutes, with the source document and the name of who approved it.
Your project's risks, not a ready-made list
The method starts from the project's purpose and from what each stakeholder cannot afford to lose. Many of the risks are derived from there. Risks that a standard list misses come to the surface, and the reserve comes from your project, not from an inherited percentage.
Systemic risks in plain sight
Scope, team and process maturity act on the whole project, not on a single item. AACE (RP 42R-08) treats systemic risks as one of the biggest drivers of cost and schedule overruns. An ordinary risk matrix does not capture them. Archai Risk assesses them separately, dimension by dimension.
On a US$ 100 million project, each percentage point of contingency is worth US$ 1 million. It is worth checking whether your percentage is right.
How much is each point of your contingency worth?
Enter your project's numbers. The calculation runs in your browser and the values are not sent to us.
This is plain arithmetic with your own numbers. It does not estimate your project's risk. That is what the diagnosis is for.
A method tested on megaprojects before it became software.

Guilherme Pereira Lima, MSc, PMI-PMP, PMI-PMOCP. Civil engineer with over 30 years in planning, controls, contracts and risk for megaprojects and capital programs in mining, infrastructure, oil & gas and industry. He was Planning and Controls manager at S11D (Vale), a US$ 4.5 bn project delivered two months ahead of schedule. Academic Director of AACE Brasil and guest expert on engagements with McKinsey and EY. He has taught at Fundação Dom Cabral, FGV and PUC Minas. Author of six books, including First Principles Project Risk Management and Gestão de Riscos pelos Primeiros Princípios.
Archai (ἀρχαί) is the word Aristotle used for first principles: the origins from which everything else derives. The method starts from them, not from an inherited percentage.
Developed by GP Líder Ltda. · In production in Portuguese, English, Spanish and French
Three steps. From document to number, with the origin of every piece of data.
Your team stops building spreadsheets and starts deciding. The repetitive work is automated. Approval remains with a person.
Load
Send the documents, the budget and the schedule as they are. Archai Risk reads them, organizes them and gets the project ready for analysis.
Agents read · you confirm the scope
Attest
Archai Risk proposes risks, responses and impact ranges. Your team approves, adjusts or rejects each item. Nothing enters the calculation without human attestation.
Agents propose · you attest
Decide
You leave with the cost and schedule reserve, the calculation that justifies it and the report ready for the gate, the audit or the lender.
Agents calculate · you decide
From the document that comes in to the risk you track.
The 11 stations of Archai Risk, in the order your project goes through them.
- Foundations
- 1DocumentsProject documents come in and become context in the graph.
- 2Context & Value ChainPurpose, stakeholders and assumptions, connected.
- Risks
- 3Risk ChainAgents propose risks, causes and responses; your team attests.
- Quantification
- 4Base / BudgetThe budget is checked side by side with the original and attested.
- 5LinksEach risk is linked to the budget lines it threatens.
- 6QuantificationThree-point probability and impact, with a calculation record.
- 7PanoramaThe whole portfolio in the risk breakdown structure: inherent × residual.
- 8Cost SimulationAuditable Monte Carlo: cost contingency at P80.
- 9Schedule SimulationRisks on schedule activities: schedule contingency at P80.
- 10ReportsRisk register, executive report and simulation report.
- Tracking
- 11Live trackingField signals become alerts; a person attests each one.
↺ What tracking detects flows back into the risk chain, with human attestation: contingency follows the project instead of stopping at the gate.
Twelve steps. One environment. No spreadsheet in between.
Context, stakeholders, first principles and purpose. Systemic risks, identification, four-causes analysis and response planning. Quantitative cost and schedule analysis, each with built-in Monte Carlo simulation, and integrated cost and schedule analysis. Risk tracking during project execution and construction.
Everything integrated in a single environment, end to end. AI agents do the heavy lifting at every step, and a person attests every result. Nothing is exported, recalculated in another tool and imported back.
- Context
- Stakeholders
- First principles
- Purpose
- Systemic risks
- Identification
- Four-causes analysis
- Response planning
- Cost · Monte Carlo
- Schedule · Monte Carlo
- Integrated cost + schedule
- Live tracking
- Foundations
- Risks
- Quantification
- Tracking
What changes in practice.
| Today (spreadsheet / generic simulator) | With Archai Risk |
|---|---|
| Contingency by historical percentage | Reserve calculated on your actual budget: you defend the amount, not a percentage |
| Cost and schedule simulated separately | Cost and schedule in the same calculation: delay already shows up as money |
| Risks enter the calculation without formal review | No risk enters the calculation without approval: you answer for the number with confidence |
| Results with no auditable origin | Any number can be explained in minutes, with its source, in front of the auditor: full traceability |
| Documents, spreadsheets and versions scattered around | Engineering, finance and the board looking at the same number |
| Every revision is redone by hand | When an assumption changes, the reserve is recalculated with no rework for the team |
| Knowledge leaves with whoever leaves the project | What one project taught stays available for the next |
| Only event risks make it into the matrix | Systemic risks assessed separately, in line with AACE (RP 42R-08) |
It is not one more simulation tool. It is the explanation of why the number is what it is, ready to be presented.
And when risk becomes a gate decision?
Archai Pro keeps what was decided, why, with which alternatives and who approved it. Every stage, from context to verdict, goes through a person's approval. Two years later, in the claim or the audit, you present the record instead of reconstructing the story.
- Decision Ledger
- Executive, specialist or collegiate perspective
- Integrated with Archai Risk
What project leaders ask before booking.
I already do this in a spreadsheet or a Monte Carlo simulator.
Those tools calculate. Archai Risk calculates and explains: each risk carries its source document, who approved it and which response was planned. It is what you present at the gate, in the claim and in the audit, with no extra work.
The AI will make up risks.
No risk enters the calculation without human attestation. The agents propose; your team approves, adjusts or rejects. The system records the user who decided.
I don't have a dedicated risk team.
The flow is guided in three steps and the contextual Hermes explains the next action on every screen. In the pilot, deployment is supported by GP Líder.
What language is the diagnosis meeting in?
Portuguese or English, your choice. The time is shown in your time zone and confirmed in Brasília time (GMT-3); the meeting takes place on Google Meet, with an invitation on your calendar.
What languages is the product available in?
Portuguese, English, Spanish and French — in production.
How long until the first result?
It depends on the team's commitment. An experienced analyst with the information at hand can, starting from scratch, run the entire value and risk chain and the cost and schedule quantification stations in just 1 day.
Why the number can be trusted.
Two technical reasons explain why the number holds up: specialized agents that propose and a graph that keeps the origin of every piece of data.
14 specialized agents, 12 with direct interaction
Each agent does one thing well: read a document, identify a risk, propose a response, estimate a range, simulate, explain. None of them decides. The contextual Hermes explains, on every screen, the next step and why — so the project team can operate without depending on an AI specialist.
Graph Engineering: a single source of truth
Documents, evidence, assumptions, risks, responses, simulations and decisions are nodes linked in a project context graph, on top of a knowledge graph that persists across projects. There is no spreadsheet copy and no parallel version: what the gate sees is what the graph contains. Ask "where did this P80 come from?" and the answer is a path, not an opinion.
- Single Source of Truth
- Provenance of every number
- Memory across projects
- Neo4j, optional on-premise
Find out in 30 minutes how much of your contingency is defensible.
What you get
- A diagnosis of your project or portfolio, with the questions the gate will ask
- An Archai Risk demo with sample data — or with yours, if you prefer
- A 3-week pilot proposal, when it makes sense for both sides
You pick the time on the spot, in your time zone. The invitation arrives on your calendar with the Google Meet link. Meeting in Portuguese or English.
- 1 · Your details
- 2 · Time
- 3 · Confirmed
Times from 9 a.m. to 5 p.m. Brasília time, on business days, converted to your time zone. Crossed-out times are already taken. 30-min meeting on Google Meet.
In the meantime:
Need to cancel or reschedule?